One of 1963 Safety Management Series in which safety engineer John previews upcoming supervisor's safety meeting on Training for Safety with shop foreman Larry. John has arranged for drill press to be located in training room and has Larry simulate instructing a new man. Together they come up with the acceptable format: 1) Lay the ground work. 2) Get the trainee prepared (at ease). 3) Show what is to be done and how to do it. 4) Test and check, test and check.